Kitchen mid-renovation with cabinets installed and protective sheeting

Electrical Remodels

Electrical Remodels in Bothell

New circuits, lighting and appliance power for the rooms you are renovating, worked out before rough-in so the project keeps moving.

Plan my renovation wiring — (000) 000-0000

The Best Time to Plan the Wiring

A remodel offers a rare opportunity: while the studs are exposed, adding a circuit or moving a switch is quick and inexpensive. Once drywall, tile and cabinets are in place, the same change involves cutting, patching and repainting. That is why we like to be involved while your plans are still taking shape.

Together we list every new load the project introduces, from an induction cooktop and wall oven to heated floors, under-cabinet lighting and island outlets. We check that your panel can support them, draw up a clear circuit plan and price the rough-in and the finish work separately, so you can see exactly what each stage costs.

If you are working with a general contractor, we coordinate with them directly; if you are managing the project yourself, we will help you understand which inspections come when and how to schedule the other trades around them.

What Renovation Wiring Covers

From the first sketch to the final cover plate.

Load review

Every new appliance and fixture added to your existing demand to confirm the panel can carry the project.

Circuit plan

Outlets, switches, lighting and appliance circuits laid out room by room and agreed before work begins.

Kitchen appliance power

Dedicated circuits sized to the cooktop, oven, dishwasher and other equipment you have selected.

Island and counter outlets

Placed where the code expects them and where they will genuinely be useful.

Bathroom safety

Ground-fault protected outlets, a properly sized fan circuit and vanity lighting placed for real use.

Basements and additions

New branch circuits, lighting and interconnected smoke-alarm wiring as the plans require.

Rough-in inspection

Boxes and wiring inspected before insulation, so nothing is hidden unchecked.

Finish and labelling

Devices and fixtures fitted after painting, each circuit tested and recorded in the panel directory.

How We Work Through a Renovation

  1. Planning

    We review drawings or walk the space with you, list the new loads and check the panel, then send a scope that separates rough-in from finish.

  2. Rough-in

    When framing is complete we install boxes and cable and arrange the rough-in inspection; walls close only once it has passed.

  3. Finishing

    After painting we fit devices and fixtures, test every circuit, book the final inspection and show you the changes.

Why Renovators Choose Us

Capacity confirmed early

No unwelcome discovery that the service is too small once cabinets arrive.

Schedule-friendly

Inspections are booked ahead so other trades are never left waiting.

One shared plan

A written circuit layout everyone on the project can work from.